My order was accepted in march when it was listed as a engine upgrade. Ship date just keeps getting pushed back time after time.
Where have seen that they switched over to 2023 in July? I haven't seen a single 2023 anywhere. Anyways you can build 2023 on the website now, Wagoneers are Hurricane only , grand Wagoneers are Hurricane or 6.4L V8.Thats odd. Everything I have seen says they stopped building 22MY in July and switched over to 23MY. Regardless that was what caused the delay. They tied the new engine to the new MY as they are axing the 5.7 Hemi in the regular Waggys in favor of the hurricanes. GWs I'm not sure if they are still going to offer the 6.4 or just the Hurricane.
Its gonna ship this time don't worrymy dealer thought the exact same things but it still shows mine is going to be built as a 22.
oh, dont you know it.Its gonna ship this time don't worry
What do you mean 10/12? Do you know when they will start 23's?Just got an update from my neighbor, specifically about your vin. They had such a backlog they kept running 22MY through 10/12. Yours is currently on the line being assembled. Not saying that eta is accurate, but it’s on its way for real this time.
my bad earlier I was operating off old information from him.
The number one quote from a not so famous man but as true as anything I’ve ever been told, “who you are don’t mean spit, who you know is much more important!”Just got an update from my neighbor, specifically about your vin. They had such a backlog they kept running 22MY through 10/12. Yours is currently on the line being assembled. Not saying that eta is accurate, but it’s on its way for real this time.
my bad earlier I was operating off old information from him.
Ah ok Im an idiot. Thanks for the info!!I always thought the quote was “who you have naked pictures of”? October 12 sorry 10/12 was shorthand. 23s are supposed to start production oct 13ish(non long wheel base)
I’ve got the same situation as you. Mine still says a 22 and they keep pushing the build date every weekmy dealer thought the exact same things but it still shows mine is going to be built as a 22.
For sure? They keep pushing my date back a week every 5-6 days.see my post above. 22s are being built out until 10/12. so if your build sheet still says 2022 then its getting built within the next 3 weeks.
Don't know the answer but what is your current date. Curious if anything is rolling off the lineFor sure? They keep pushing my date back a week every 5-6 days.